ITinvestPortfolio › Project Keystone

Real assets · Aggregates & mining

Project Keystone

An operating granite aggregate quarry, built for the rebuild.

A permitted, certified granite quarry and modern crushing-and-screening plant in Western Ukraine, with its own rail logistics and a large contracted order book — positioned for the reconstruction-driven demand for road-base and construction aggregate. The company and exact location are disclosed under NDA.

Capacity120–150k t/mo
Reserves~100 Mt
Capital soughtfrom US$6M
InstrumentGrowth / JV
StatusOpen

At a glance

Open
Sector
Granite aggregate & road-base
Instrument
Growth capital / JV
Capital sought
from US$6M
Reserves
~100 Mt (~95 ha licensed)
Capacity
120,000–150,000 t / month
Geography
Western Ukraine · under NDA
Order book
≈ ₴800M contracted
Logistics
Own rail siding + freight yard
Data room
Under NDA

Executive summary

A cash-generative real asset for the reconstruction.

Project Keystone is an operating granite quarry and modern processing plant producing certified crushed stone and road-base aggregate. It holds a special subsoil-use permit over a ~95-hectare deposit with an estimated ~100 million tonnes of granite reserves — decades of extraction — and runs a high-throughput Metso crushing-and-screening line. A rare combination of permit, plant, reserves and rail logistics in a single asset.

Growth capital of from US$6M completes the rail-logistics build-out and lifts the operation toward its full 120,000–150,000 t/month capacity, against a contracted order book of ≈ ₴800M. Instrument and full terms are set out in the data room; the company and exact location are disclosed under NDA.

The opportunity

Built for the rebuild.

01

Reconstruction demand

Ukraine’s rebuild needs vast, sustained volumes of road-base and construction aggregate; state- and donor-funded road programmes run for years.

02

Certified for roads

Products are certified to DSTU 9177-2:2022 for road-base mixes (C5, C7) — directly usable in state road works, not just private construction.

03

Export optionality

A western-Ukraine position opens aggregate export toward the EU as domestic and cross-border demand grows.

04

Scarce permitted supply

Permitted, radiologically-compliant granite capacity is scarce and slow to license — a barrier that protects incumbents.

The asset

A permitted quarry with a modern plant.

Long-life reserves

~100 Mt of granite over a ~95 ha deposit held under a special subsoil-use permit — a multi-decade resource.

High-throughput line

Metso C125 jaw crusher (~870 t/h), HP300 and Nordberg GP300S cone crushers, and FS300 screens (~550 t/h) for clean fraction separation.

Capacity & flexibility

120,000–150,000 t/month, with fractions tailored to each order: 5–20, 20–40, 40–70, 70–150 mm, 0–5 mm sand, and C5/C7 road-base mixes.

Energy independence

An on-site 1 MW substation and transformer set cut energy cost and de-risk supply — a real margin and resilience advantage.

Logistics edge

A rail moat few competitors hold.

Bulk aggregate is won or lost on freight. Project Keystone ships by rail from its own siding — two loading tracks and one unloading track — connected to the national network.

Why it matters. Owning the rail link lets the asset move volume at low cost and serve large, distant road contracts that truck-only competitors cannot economically reach.
  • ~6.5 km access spur reconstructed (≈850 t of rail, ~10,500 sleepers) — largely complete.
  • Freight yard under construction: switches, signalling and a 100-tonne twin-section rail weighbridge.
  • Two overhauled diesel locomotives owned outright (≈₴37M invested).
  • ~US$6M total rail-and-yard programme — the core of this raise.

Commercial traction

Contracted, not hypothetical.

Supply agreements with major road and infrastructure contractors total ≈ ₴800M (customer names under NDA). With cost of goods at roughly 50–60% of contract value, the order book carries a healthy gross margin — demand is booked, and capital is about fulfilling it.

Compliance & team

Permitted, certified, operated.

Full high-danger-works and subsoil-use permits; product conformity to DSTU 9177-2:2022; and radiological safety cleared (effective activity 205 < 370 Bq/kg, NRBU-97). Run by operators with mining, plant and rail experience who are executing the build-out now.

Products

Certified granite, every fraction.

Construction crushed stone

Dense natural granite in 5–20, 20–40, 40–70 and 70–150 mm fractions for materials, structures and works.

Road-base mixes

Crushed-stone–sand granite mixes C5 (0–70 mm) and C7 (0–40 mm) to DSTU 9177-2:2022 for road foundations.

Screening sand

0–5 mm granite screening sand for construction works.

Verified safe

Radiological safety confirmed to NRBU-97; conformity certificates held for the full product range.

Use of funds

Where the capital goes.

Rail access & freight yard

Complete the ~US$6M spur and yard: switches, signalling and the 100-tonne weighbridge.

Plant completion

Finish and optimise the crushing/screening line to hold full monthly capacity.

Handling & rolling stock

Loaders, materials handling and locomotive readiness for sustained throughput.

Working capital

Fund the ramp and the contracted order book through to steady-state cash flow.

Indicative. The ~US$6M headline covers the rail-logistics programme; the full budget is in the data room.

Terms & structure

Confidential by design.

Project Keystone is offered as growth capital / a joint venture. The operating company holds the subsoil-use permit, the processing plant and the rail assets. Structure, ownership, titles and the capital plan are provided under NDA.

Headline capital sought is from US$6M for the logistics build-out; larger participation and a full buy-in are open for discussion in diligence.

Confidential listing. The company name, permit and cadastral numbers, exact location, and customer identities are deliberately withheld on this page and disclosed only inside the NDA-gated data room.

Data room

The full picture, under NDA.

Request access and sign a short mutual NDA to open the confidential materials.

Request access
Company identity, permits & exact locationNDA
Subsoil-use permit & geological reserves reportPDF · locked
Product certificates & radiological protocolsPDF · locked
Plant & equipment schedule + valuationsXLSX · locked
Rail-logistics capex plan & statusPDF · locked
Contracted order book & customer agreementslocked
Financial model & unit economicsXLSX · locked

Invest in Project Keystone

See the full picture, under NDA.

Request access for the confidential data room, or book a call with the team.